Snagging List Template UK: Copy, Use and Close Out Snags Faster

William Charlesworth-Jones William Charlesworth-Jones 6 min read

Quick Answer

A good UK snagging list needs seven columns: snag number, location, description of the defect, a photo, the trade responsible, the deadline, and status. Each snag should be specific enough that the trade can find and fix it without a phone call (“bedroom 2, paint run on window reveal, north wall” rather than “paint issues upstairs”). Copy the template below, or use an app like BuildersAI to capture snags with geo-tagged photos and track every one to closed.

This is the companion template to our full snagging lists guide. That article covers the when and the how of snagging inspections; this one gives you the format to copy.

The Template

Seven columns. Fewer and snags become untraceable; more and nobody fills it in.

#LocationDescriptionPhotoTradeDeadlineStatus
001Plot 4, bedroom 2Open
002
  • # (snag number): every snag gets one, and it never changes. “Snag 041” survives a phone call; “the door thing” does not.
  • Location: plot, room, then position. Specific enough to walk straight to it.
  • Description: what is wrong and what right looks like, in one or two sentences.
  • Photo: one photo per snag minimum. This is the column that ends the arguments.
  • Trade: the company or person responsible for the fix, named.
  • Deadline: a date, not “ASAP”. Snags without dates drift to handover day.
  • Status: Open, Fixed (awaiting check), or Closed. Only the inspector moves a snag to Closed.

A Worked Example

#LocationDescriptionPhotoTradeDeadlineStatus
041Plot 4, bedroom 2Paint run on window reveal, north wall. Rub down and repaint reveal.ABC Decorators24 JulOpen
042Plot 4, kitchenCupboard door under sink misaligned, does not close flush. Adjust hinges.JT Joinery24 JulFixed
043Plot 4, hallwayScratch on laminate flooring by front door, 15cm. Replace board.JT Joinery26 JulOpen
044Plot 5, bathroomMastic bead around bath incomplete on tap end. Complete seal.ABC Plumbing24 JulClosed

Notice what makes these usable: each one names the exact spot, states the defect and the fix, and belongs to someone with a date. Any trade could pick this list up cold and get to work.

The Rules That Make It Work

  1. One snag per row. “Various paint issues, plot 4” is not a snag, it is a future argument. Split everything.
  2. Photograph everything at the point you find it. The photo proves the defect existed, and the after photo proves the fix. Geo-tagged and timestamped photos close the “that was not like that when we left” conversation before it starts.
  3. Fixed is not Closed. The trade marks a snag Fixed; only the site manager or inspector marks it Closed after checking. Skipping the check is how “finished” snag lists reappear at handover.
  4. Review the list at a set rhythm. Twice a week during the snagging period. A snag list nobody reviews is a document, not a process.
  5. Never delete a snag. Disputed items get a note, not removal. The list is your handover evidence.

Trade-by-Trade Prompts

Walking a plot with prompts catches far more than walking it cold. The full trade-by-trade checklist is in the main guide, but the short version:

  • Decoration: runs, misses, coverage on reveals and behind radiators, filler visible through paint.
  • Joinery: door alignment and closing, handle operation, skirting joints, architrave mitres.
  • Plumbing: mastic seals complete, taps secure, no weeping joints, toilet flush.
  • Electrics: sockets and switches level and working, faceplates unmarked, light fittings secure.
  • Flooring: scratches, lifting edges, thresholds, grout consistency.
  • Externals: pointing, sealant around frames, gulley covers, garden levels and turf.

Paper, Excel or App?

Paper works for a one-off walk but produces a list nobody else can see, with photos stranded on someone’s phone, disconnected from the numbers.

Excel is the classic, and it is fine right up until you try to attach photos, share it with six trades, or work out on a Friday which of 60 snags are genuinely closed.

An app removes the admin that kills snag lists: in BuildersAI each snag is a task with a geo-tagged, timestamped photo attached, assigned to the trade with a deadline, and visible to everyone as it moves from open to done. The evidence gathers itself, which matters when a client queries the finish months later. 14-day free trial with every feature, works offline on site.

Snagging with the evidence built in

See how UK sites run snagging in BuildersAI: photo-evidenced snags, assigned to trades, tracked to closed.

FAQ

What should a snagging list template include?

Seven columns: snag number, location, description, photo, responsible trade, deadline, and status. Each snag needs to be specific enough that the responsible trade can find and fix it without a phone call, and the status column should distinguish Fixed (trade says done) from Closed (checked and accepted).

Who is responsible for the snagging list on a UK site?

The site manager or main contractor typically owns the list, raises the snags and closes them after checking. Each individual snag belongs to the trade responsible for the fix. On new-build homes, buyers often commission an independent snagging inspector, whose report feeds the same process.

When should snagging start on a construction project?

Earlier than handover. Snagging each area as trades complete it catches defects while the trade is still on site and the fix is cheap. A final pre-handover inspection then confirms rather than discovers. Our full snagging guide covers the timing in detail.

Is there an app for snagging lists?

Yes. Site management apps let you raise each snag as a task with a geo-tagged photo, assign it to a trade with a deadline, and track it to closed. BuildersAI does this as part of its task and photo system, with a 14-day free trial, and works offline on site.

Ready to fix this on your site?

Stop losing hours to coordination chaos

BuildersAI puts drawings, tasks, and updates on every phone on site. 14-day free trial, every feature, no card.

William Charlesworth-Jones

William Charlesworth-Jones

Founder, BuildersAI

Founder of BuildersAI with a background in construction and economics. After watching coordination chaos waste hours on every site, he set out to build AI tools that actually work for UK builders.

LinkedIn

Related articles

Construction Software

Short-Interval Planning in Construction: The Complete UK Guide

The master programme says what should happen this quarter. Short-interval planning is how good sites decide what actually happens this week, and it is the single biggest difference between sites that flow and sites that firefight.