Snagging List Template UK: Copy, Use and Close Out Snags Faster
Every failed snagging list fails the same way: vague descriptions, no owner, no deadline, no evidence. Here is a template that fixes all four, with a worked example you can copy this afternoon.
- Author
- William Charlesworth-Jones
- Category
- Construction Software
- Published
- Updated
- Reading time
- 6 min read
This is the companion template to our full snagging lists guide. That article covers the when and the how of snagging inspections; this one gives you the format to copy. If you would rather start from a file, the free snagging list template comes in Excel and PDF, with a room-by-room checklist and a snag log.
The Template
Seven columns. Fewer and snags become untraceable; more and nobody fills it in.
| # | Location | Description | Photo | Trade | Deadline | Status |
|---|---|---|---|---|---|---|
| 001 | Plot 4, bedroom 2 | Open | ||||
| 002 |
- # (snag number): every snag gets one, and it never changes. “Snag 041” survives a phone call; “the door thing” does not.
- Location: plot, room, then position. Specific enough to walk straight to it.
- Description: what is wrong and what right looks like, in one or two sentences.
- Photo: one photo per snag minimum. This is the column that ends the arguments.
- Trade: the company or person responsible for the fix, named.
- Deadline: a date, not “ASAP”. Snags without dates drift to handover day.
- Status: Open, Fixed (awaiting check), or Closed. Only the inspector moves a snag to Closed.
A Worked Example
| # | Location | Description | Photo | Trade | Deadline | Status |
|---|---|---|---|---|---|---|
| 041 | Plot 4, bedroom 2 | Paint run on window reveal, north wall. Rub down and repaint reveal. | ✔ | ABC Decorators | 24 Jul | Open |
| 042 | Plot 4, kitchen | Cupboard door under sink misaligned, does not close flush. Adjust hinges. | ✔ | JT Joinery | 24 Jul | Fixed |
| 043 | Plot 4, hallway | Scratch on laminate flooring by front door, 15cm. Replace board. | ✔ | JT Joinery | 26 Jul | Open |
| 044 | Plot 5, bathroom | Mastic bead around bath incomplete on tap end. Complete seal. | ✔ | ABC Plumbing | 24 Jul | Closed |
Notice what makes these usable: each one names the exact spot, states the defect and the fix, and belongs to someone with a date. Any trade could pick this list up cold and get to work.
The Rules That Make It Work
- One snag per row. “Various paint issues, plot 4” is not a snag, it is a future argument. Split everything.
- Photograph everything at the point you find it. The photo proves the defect existed, and the after photo proves the fix. Geo-tagged and timestamped photos close the “that was not like that when we left” conversation before it starts.
- Fixed is not Closed. The trade marks a snag Fixed; only the site manager or inspector marks it Closed after checking. Skipping the check is how “finished” snag lists reappear at handover.
- Review the list at a set rhythm. Twice a week during the snagging period. A snag list nobody reviews is a document, not a process.
- Never delete a snag. Disputed items get a note, not removal. The list is your handover evidence, and on a new build it goes into the plot’s handover pack.
Trade-by-Trade Prompts
Walking a plot with prompts catches far more than walking it cold. The full trade-by-trade checklist is in the main guide, but the short version:
- Decoration: runs, misses, coverage on reveals and behind radiators, filler visible through paint.
- Joinery: door alignment and closing, handle operation, skirting joints, architrave mitres.
- Plumbing: mastic seals complete, taps secure, no weeping joints, toilet flush.
- Electrics: sockets and switches level and working, faceplates unmarked, light fittings secure.
- Flooring: scratches, lifting edges, thresholds, grout consistency.
- Externals: pointing, sealant around frames, gulley covers, garden levels and turf.
Paper, Excel or App?
Paper works for a one-off walk but produces a list nobody else can see, with photos stranded on someone’s phone, disconnected from the numbers.
Excel is the classic, and it is fine right up until you try to attach photos, share it with six trades, or work out on a Friday which of 60 snags are genuinely closed.
An app removes the admin that kills snag lists: in BuildersAI each snag can be pinned to the spot on the drawing, with a geo-tagged, timestamped photo, assigned to the trade with a deadline. The trade adds a photo of the fix, and a project administrator checks it before it is closed, which is the Fixed and Closed rule above. The photos stay on the job, which matters when a client queries the finish months later. 14-day free trial with every feature, works offline on site.
BuildersAI
Snagging with the evidence built in
See how UK sites run snagging in BuildersAI: photo-evidenced snags, assigned to trades, tracked to closed.
FAQ
What should a snagging list template include?
Seven columns: snag number, location, description, photo, responsible trade, deadline, and status. Each snag needs to be specific enough that the responsible trade can find and fix it without a phone call, and the status column should distinguish Fixed (trade says done) from Closed (checked and accepted).
Who is responsible for the snagging list on a UK site?
The site manager or main contractor typically owns the list, raises the snags and closes them after checking. Each individual snag belongs to the trade responsible for the fix. On new-build homes, buyers often commission an independent snagging inspector, whose report feeds the same process.
When should snagging start on a construction project?
Earlier than handover. Snagging each area as trades complete it catches defects while the trade is still on site and the fix is cheap. A final pre-handover inspection then confirms rather than discovers. Our full snagging guide covers the timing in detail.
Is there an app for snagging lists?
Yes. Site management apps let you raise each snag as a task with a geo-tagged photo, assign it to a trade with a deadline, and track it to closed. BuildersAI does this as part of its task and photo system, with a 14-day free trial, and works offline on site.
Written by
William Charlesworth-Jones
Founder, BuildersAI
William grew up in a family that builds houses for a living and has been around construction sites for as long as he can remember. He has seen first hand that eight-figure sites are often run on WhatsApp and spreadsheets, and started BuildersAI to cut the invisible costs that take chunks of margin across a site. His aim is for BuildersAI to be the all-in-one site management platform built in the UK, for UK sites.