A Gantt chart takes effort to read if you do not read one every day. 3D build shows the same programme as the building going up: SiteBot draws a rough 3D model of the job from its drawings, each part is linked to the tasks that build it, and you play the programme through it day by day.
It is in a browser only, from 3D build in the project’s sidebar. Administrators and members of the project see it. Followers, such as the client, do not see it yet.
A rough model, not a survey. SiteBot draws it from up to four drawing pages. It is not to scale and it is not for setting out, quantities or clearances: always check the drawings. Its job is to show the order of work at a glance.
Drawing a model (project administrators):
- Open 3D build and click Draw a model
- Tick up to four drawings from the register. SiteBot reads the first page of each. A ground floor plan and an elevation work best
- Click Draw a model and wait about a minute
SiteBot names each part (the foundations, the ground floor walls, the roof) and suggests which tasks build it. Check its suggestions.
A drawing kept for administrators can be used, but then the model is kept for administrators too, even if that drawing is deleted later. If one of its drawings is later kept for administrators or withheld, the model is hidden from the people who can no longer open it.
Linking parts to tasks (project administrators):
- Find the part under Parts of the model, or click it on the model
- Click Link tasks, tick the tasks that build it, and click Save links
Reminders, notes, material lines and private tasks cannot be linked. A part with no task stays pale on the model.
Playing the programme:
- The slider runs from the day before the first linked task starts to the day after the last one ends, so its two ends show nothing started and the job finished. Drag it to any day, click Play to watch the job go up, or Today to see where the programme says the job should be now
- A part is under way (amber) from the planned start of its first linked task to the planned end of its last, and built after that
- A part not started yet is hidden. Tick Show parts not started yet as outlines to see the whole building as outlines
- Turn left and Turn right turn the model an eighth of a turn at a time
- The line under the slider says how many parts are built, under way and not started on that day
The model follows the planned dates of the tasks, not whether they are marked done. A task running late does not make a part disappear: move its dates on the programme and the model follows.
Drawing again or deleting it:
- Draw again replaces the model and its links once the new one is ready. If SiteBot cannot draw a new one, the old one stays
- Delete the model removes it and its links. The drawings and tasks are not changed
Limits: each person can draw five models in 24 hours. When SiteBot is very busy across BuildersAI it may ask you to try again later. A project that is read-only keeps its model as it is.