Drawing tags get you from 40 sheets down to the 6 for plot 12. As well as the header it is filed under, a drawing can carry tags. Tags sit in groups an admin has set up for the project, usually something like Plot, Floor, Phase or Zone.

Filtering by tags in the browser:

  1. Open Drawings. Above the list there is a row of chips for each tag group, with the group’s name in front of it
  2. Click a chip to switch that tag on, and click it again to switch it off
  3. Two chips in the same group widen the list: Plot 12 or Plot 14
  4. Chips in different groups narrow it: Plot 12 and Ground Floor
  5. Clear filters, underneath the chips, puts everything back

Filtering by tags on the phone:

  1. Open Drawings and tap the funnel icon at the top right. It is only there once the project has tag groups
  2. Tick the tags you want and tap Done. The funnel then carries a small number for how many you have ticked
  3. The tags you picked sit in a strip under the header. Tap one to take it off, or tap Clear all at the end of the strip to drop the lot
  4. Groups combine exactly as they do in the browser: any of the tags you picked within one group, and every group you picked from

Setting up tag groups and tags (admins, web app only):

  1. Open Project Settings and go to Tags (the card is titled Tag groups)
  2. Type a group name into the box at the bottom, for example Plot, Floor or Phase, and click Add group
  3. Type a tag into that group’s own box, for example Plot 1, and click the + beside it
  4. To rename a tag, double-click it and type. To remove one, hover over it and click the small x
  5. Deleting a group deletes its tags and takes them off every drawing they were on

Putting tags on a drawing (admins, web app only):

  • When you upload: tick the tags for each row in the Upload Plans dialog
  • Afterwards: click the pencil on the drawing’s row and pick the tags in Edit plan
  • The phone can filter by tags but cannot create or change them, so this part is done at a computer

Handing a plot over:

  • Handover pack on the Drawings page gathers everything the project holds for one plot into a ZIP. It appears once the project has a tag group called Plot. See the “handover_pack” topic

Tags and headers are different things:

  • A drawing sits under one header, which says what kind of drawing it is: Architectural, Structural, or one of the job’s own such as Surveys. See the “drawing_headers” topic
  • A drawing can carry several tags, which say what part of the job it is for: a plot, a floor, a phase
  • For everything else about drawings (viewing, adding, revisions, markup), see the “plans” topic