Request a demo, get a 14-day free trial. →
BuildersAI

Free tools / Site diary template

Free site diary template

A one-page daily site diary for UK builders, in Excel or PDF. It records the weather, who was on site, the work done, every delay with its cause, deliveries, instructions and safety. Free to download and change, with no sign-up.

The site diary template: one A4 page with sections for the day, labour on site, work done, delays and hold-ups, deliveries and plant, and visitors, instructions and safety.

What is in it

The day
Project, date, who wrote it, and the weather morning and afternoon.
Labour on site
Each company or trade, names, numbers, hours, start time and where they worked.
Work done today
What was done and where, and anything started, finished or inspected.
Delays and hold-ups
The cause (weather, no access, materials, plant, labour, information, instruction or other), what happened, hours lost and who was told.
Deliveries and plant
Supplier, what arrived or was hired, the delivery note number and who checked it.
Visitors, instructions and safety
Who came on site, instructions received and from whom, accidents, near misses and toolbox talks, and photos taken.

The Excel version has a drop-down list for the delay cause and a How to use tab. Copy the sheet for each day.

Common questions

Site diaries, answered.

What should a site diary include?

The date and weather, who was on site and for how long, the work done and where, any delays with their cause, deliveries and plant, visitors, instructions received, and any accidents or near misses. It should be written on the day by the person running the site, and signed.

Why does a site diary matter?

It is the day-by-day record of what happened on a job. When there is a dispute about delays, extra work or who was on site, a diary written at the time is usually the best evidence a builder has. A diary written up days later carries less weight.

Should delays be recorded with a cause?

Yes. Recording the cause of each delay, such as weather, late materials or a missing drawing, and who was told, is what lets you show later which delays were outside your control. This template has a cause column with a drop-down list in the Excel version.

Is this template free to use?

Yes. Download it, change it and use it on as many jobs as you like. No sign-up is needed.

Keeping the diary on a phone instead

BuildersAI keeps the site diary in the app: the weather is added for you, each person on site adds what they did, a photo and anything that held them up in under a minute, and delays are logged with the same causes as this sheet.

See the site diary in BuildersAI

Get started

Ready to bring your whole team onto one simple app?

14-day free trial with every feature, no card and no contract, and your team can be set up within a day.