A risk assessment and method statement template for UK building work, in Excel or PDF. The method statement sets out how the job is done safely, the risk assessment scores each hazard and its controls, and the sign-off sheet records who was briefed. Free, with no sign-up or form.

The RAMS template's method statement page: project, scope, who will do it, training and cards, plant, materials, access, permits, PPE, sequence of work, protecting others, welfare, emergency arrangements and waste.

What is in it

Method statement
The job, who is doing it and their cards, plant, materials and COSHH, access and working at height, permits, PPE, the sequence of work step by step, protecting others, welfare, emergency arrangements and waste.
Risk assessment
Each hazard, who might be harmed and how, the controls in place, likelihood and severity scored 1 to 5, further controls, the risk after them, and who acts by when.
Briefing sign-off
Name, company, CSCS card number, signature and date for everyone briefed on the RAMS.
Risk matrix
How to score likelihood and severity, and what a high, medium or low score means.

The Excel version works out each risk score for you and colours it red, amber or green, with three filled-in example hazards to replace. The PDF is three pages to print.

Common questions

RAMS, answered.

What is RAMS?

Risk Assessment and Method Statement. The risk assessment sets out the hazards of a job and how each is controlled. The method statement sets out how the job will be done safely, step by step. Main contractors usually ask subcontractors for RAMS before they start on site.

Is RAMS a legal requirement?

The law requires a risk assessment, and HSE says that if you employ 5 or more people you must record its significant findings: the hazards, who might be harmed and how, and what you are doing to control the risks. A method statement is not named in law, but it is the usual way to show how the work will be done safely, and principal contractors normally require one.

How is a risk scored?

This template scores likelihood and severity from 1 to 5 and multiplies them. 15 to 25 is high, and the work should not start until the risk is reduced. 8 to 14 is medium. 1 to 7 is low. Score the risk again after your further controls.

Who should sign the RAMS?

The person who wrote it, the person who reviewed it, and everyone doing the work, once it has been explained to them. The sign-off sheet is for the last group.

Is this template free to use?

Yes. Download it, fill it in for your job and use it as often as you like. No sign-up and no form to fill in first. It is a starting point: every RAMS must be written for the actual job and site.

Sources

Checked on 11 November 2026.

RAMS signed on the phone instead

In BuildersAI the RAMS goes to everyone on the job, and each person reads it and signs on their own phone, so you can see who has signed.